CEDAR
CREEK BIO-SOLIDS
City of Olathe, Kansas
Mid Kansas Engineering Consultants
$2,239,195.00
This Design Build project included
construction of a new 2-story, Bio-solids Dewatering
Building approximately 40' X 40' with masonry walls and
hollow core precast roof deck. Equipment installed
included an Andritz centrifuge, a polymer system, sludge
pumps & piping, fine bubble aeration in existing basin, a
new NPW system with 2 - 6" 300 GPM pumps. Project included
electrical, HVAC, instrumentation, paving and site work.
The project team's winning proposal included offering an
innovative approach to revise the existing anaerobic process
to an aerobic process which eliminated equipment and
greatly enhanced the operation of the plant. This
innovation will save nearly $500,000 over 20 years in
operation and maintenance expenses.
|