WWTP
YUMA, COLORADO
City of Yuma, Colorado
Jacobson-Helgoth
Engineers
Completed
2005
$3,223,000.00
Design/Build, Construction
of a new .7 MGD wastewater treatment plant consisting of a
two (2) 75 ft diameter "Schreiber" treatment units, concrete
& masonry headworks building containing fine screen and grit
removal, pre-engineered metal building containing lab,
office, restroom, and blower area with three - 40 HP
blowers, and earthen HDPE lined digester, two (2) bentonite
lined sludge drying beds, and two (2) effluent percolation
beds, associated piping, electrical and instrumentation.
|