[ Overview ]

Project Description

Furnish & install 5,465′ of 30″ PVC and 150′ of 30″ HDPE. F & I valves, ARV’s & blowoff’s. Misc connections to existing water mains. Rock excavation, traffic control and surface restoration. Abandon 1,950′ of existing 30″ with flowable fill. Change Order to Replace 48″ Valve.