Project Background
The WC-0948 pressure control valve installation at the Overholser Pump Station for Oklahoma City Water required precise coordination within an active municipal water system. The objective was to improve flow regulation and maintain consistent pressure across a critical section of the distribution network. Carollo Engineers, Inc. developed project specifications, establishing the technical framework for execution, materials, and performance requirements.
Site conditions included limited access, existing infrastructure constraints, and the need to maintain uninterrupted service throughout construction. Early planning efforts addressed system tie-in requirements, excavation limits, and safety procedures associated with working near active water lines. Coordination with the owner and engineering team supported clear sequencing, material staging, and crew allocation to reduce disruption, while maintaining compliance with project specifications.
Execution & Field Operations
Construction activities centered on controlled excavation and preparation within the Overholser Pump Station footprint. Crews managed trench safety, dewatering operations where necessary, and protection of adjacent utilities during all phases of work. Installation of the pressure control valve required precise alignment and secure integration with the existing pipeline system to ensure reliable performance.
Working within an operational pump station introduced additional complexity. Sequencing strategies and temporary system controls allowed continuous service while we completed critical connections. Ongoing coordination between field personnel and system operators ensured the proper execution of tie-ins and pressure adjustments without compromising system stability.
Mechanical installation included valve placement, anchoring, and connection to existing piping infrastructure. Each step followed strict quality control procedures to verify alignment, sealing integrity, and operational readiness. Testing confirmed that the valve performed as intended, responding accurately to system pressure conditions and maintaining stability under varying flow demands.
Outcome & System Performance
The completed installation at Overholser Pump Station strengthened overall system reliability by improving pressure management within the distribution network. Enhanced control capabilities support consistent service delivery and reduce stress on downstream infrastructure components.
This project highlights BRB Contractors’ ability to perform complex installations within active utility environments while adhering to engineered specifications from Carollo Engineers, Inc.