[ Overview ]

Project Description

Demolition of two low flow pumps and associated discharge piping, demolition of valves and 124 ft of piping in the holding basin drain vault, installation of new low flow pumps and 100 LF of discharge piping, installation of new valves and piping in the holding basin basin drain vault, installation of new HVAC system, bypass pumping for 20 million gallon per day capacity, painting of new pipe, instrumentation, and installation of electrical improvements.