[ Overview ]

Project Description

Replacement of approximately 1700′ of 20″ waterline with 600′ PVC/DI waterline & 1100′ 20″ Primus Line (flexible fiber reinforced pipe inside of existying pipe) pipeliner for the Vermont Street Bridge crossing. Work also includes the installation of a new flowmeter, temperature sensor and 676′ of 24″ DIP.