[ Overview ]
Project Description
Construct Improvements for New and Existing SBR Tanks, Existing Blower Building Improvements along with New Headworks Building. Construction of New Flume Structures along with 5,415 LF of 3″ to 24″ which is primarily forcemain piping and site piping around new and existing structures. electrical and instrumentation improvements for new and existing structures, site grading, structural excavation 20,372 cy, 268 SY of concrete paving, 12 manholes, fencing, seeding, concrete and building demolition, 2,169 cy of cast in place concrete, new storage building and HVAC system.