[ Overview ]
Project Description
A new cast in place 40 ft diameter solids contact clarifier tank, clarifier mechanism, cast in place valve vault, masonry structure on top of the clarifier and valve vault area, connecting 16 inch piping, precast slab roof, electrical ventilation, miscellaneous metals, relocate CO2 tank, exterior elevated walkway, concrete paving, minor site grading, seeding and demolition of the existing clarifier structure Cast in place concrete 184 CY, 10″ and 16′ pipe = 90 LF