[ Overview ]

Project Description

Install all process equipment for a new wastewater treatment plant. This includes 35 pieces of equipment, 3,096 SF of coarse bubble diffusers, 16 fluid pumps, 28 chemical pumps, 9 chemical tanks, 7 polymer blenders and mixers, 9 blowers, 6 hoists and jib cranes, 5,137 LF of CPVC pipe size 1/2 inch to 16 inch in diameter, 1,502 LF of 1/4 inch to 12 inch stainless steel pipe, 353 valves size 1/4 inch to 12 inch and other miscellaneous items.