[ Overview ]

Project Description

Construction of two (2) new wastewater pumping stations including pumping and mixing equipment, wet well and valve vault, building enclosure, electrical and controls equipment, odor control, fiber optic and water service; installation of a new pigging station including valving and vault; replacement of trees and vegetation as shown on the Plans; connection to the new force main at each station; gravity sewer as shown on the Plans, testing of the new force main and gravity sewer to the connection points.