Project is for the expansion of the existing CCUA WWTF; project to include three new 94′ diameter SBRs, new SBR1&2 building, new influent splitter box, new UV & filter building with wetwell, new sludge storage area canopy, converting two existing SBR basins to digesters, primary digester building modifications, new aluminum dome on 37′ diameter reus tank, yard piping, electrical, I&C, paint, HVAC/plumbing and two new generators.