[ Overview ]

Project Description

Primary digester cover repair including replacing a portion of the steel ceiling plate, replacing damaged concrete planks on the digester top, replace rollers, guides, safety valves, reinstall all piping, insulation and painting. Provide new sludge mixing pump, pipe, mixing nozzels and pivoting stair onto the digester cover. The base bid was awarded to BRB, not the alternate bid A.